Chisholm Creek Utility Authority Wastewater Treatment Facility Improvements
Work includes furnishing all the labor, materials, and equipment for construction of the wastewater treatment plant that includes: existing treatment equipment removal and demolition; excavation; backfilling; grading; three new SBR basins, converting the SBR basins 1 and 2 into primary digesters, converting the primary digester into a second equalization basin; 35’x50’ pre-engineered metal building addition; odor control chemical containment; belt filter press and conveyor system; sludge storage roof extension; equalization basin catwalk; lime thickener basin safety ladders; site and building concrete work; architectural work; metal frame gypsum board construction; process piping; mechanical and electrical equipment; valves, hydrants, & appurtenances; bathroom equipment; piping; gravel surfacing; grass seeding; erosion control; and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Project Manual
(click to expand/collapse)
Name | Size | ||
Bid Set Project Manual_250115 | 19.3 MB |