Roberta's Place Lift Station Replacement

Installation of new lift station structure, forcemain and service line. The installation of the new lift station also includes new duplex pump with new controls, piping, and check valves. Installation of new 2” forcemain and 4” service line via open trench. Forcemain installation includes the connection to an existing forcemain within Roberta’s Place existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building.
Roberta's Lift Station Plan Set (click to expand/collapse)