Village of Milan Water Distribution System Improvements

The Project includes the following Work: Base Bid: Well B-50: New Well will be drilled at new site and piped back with 807 LF of 8”C-900 PVC well line to existing well house for treatment. Install new chlorine generation equipment, new valves, new well pump and motor, miscellaneous building improvements and renovations, SCADA equipment. Additive Alternate #1: Well B-35: New Well will be drilled. Install new chlorination equipment, new valves, new well pump and motor, miscellaneous building improvements and renovations, and SCADA equipment. Additive Alternate #2: Tank Site (1M Gallon): Install and replace gate valves. Install mesh screen on the exterior overflow. Remove and replace manways, external and internal ladders, hatch, vent relief port, and chain rail. Install electrical SCADA equipment. Tank interior lead abatement and tank interior coating system as well as paint the exterior of the tank. Additive Alternate #3: Tank Sites (500K Gallon and 250K Gallon): Install and replace gate valves. Install mesh screen on the exterior overflow. Remove and replace manways, external and internal ladders, hatch, vent relief port, and chain rail. Install electrical SCADA equipment. Tank interior lead abatement and tank interior coating system as well as paint the exterior of the tank. Additive Alternate #4: Tank Sites (1M Gallon, 500K Gallon, and 250K Gallon): Perform tank external lead abatement procedures. Additive Alternate #5: Well B-23: Install new chlorination equipment, new valves, new well pump and motor, including miscellaneous building improvements and renovations, and SCADA equipment. Additive Alternate #6: Preform external Tank Graphic Painting on the 1M Gallon Tank.

Status

Accepting Bids

Prebid Date 3/13/25 10:00am
Bid Date 4/3/25 10:00am

Company & Contacts

Wilson & Company
Jordyn Romero  
505-348-4160

Location

Milan, NM

The Project includes the following Work:

Base Bid:

Well B-50: New Well will be drilled at new site and piped back with 807 LF of 8”C-900 PVC well line to

existing well house for treatment. Install new chlorine generation equipment, new valves, new well pump

and motor, miscellaneous building improvements and renovations, SCADA equipment.

Additive Alternate #1:

Well B-35: New Well will be drilled. Install new chlorination equipment, new valves, new well pump and

motor, miscellaneous building improvements and renovations, and SCADA equipment.

Additive Alternate #2:

Tank Site (1M Gallon): Install and replace gate valves. Install mesh screen on the exterior overflow.

Remove and replace manways, external and internal ladders, hatch, vent relief port, and chain rail.

Install electrical SCADA equipment. Tank interior lead abatement and tank interior coating system as

well as paint the exterior of the tank.

Additive Alternate #3:

Tank Sites (500K Gallon and 250K Gallon): Install and replace gate valves. Install mesh screen on the

exterior overflow. Remove and replace manways, external and internal ladders, hatch, vent relief port,

and chain rail. Install electrical SCADA equipment. Tank interior lead abatement and tank interior coating

system as well as paint the exterior of the tank.

Additive Alternate #4:

Tank Sites (1M Gallon, 500K Gallon, and 250K Gallon): Perform tank external lead abatement

procedures.

Additive Alternate #5:

Well B-23: Install new chlorination equipment, new valves, new well pump and motor, including

miscellaneous building improvements and renovations, and SCADA equipment.

Additive Alternate #6:

Preform external Tank Graphic Painting on the 1M Gallon Tank.

Please submit all questions to jordyn.romero@wilsonco.com and ross.gabaldon@wilsonco.com