City of Quinter, KS - Water Supply System Improvements PWS Well #13
Status
Accepting Bids
Bid Date | 2/13/25 1:30pm |
Location
Quinter KS
The Project includes the following Work:
Water Supply System Improvements: Work includes furnishing all the labor, materials, and equipment for construction of a water supply well; chlorination building; excavation; backfilling; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; valves, hydrants, & appurtenances; 4 inch water supply line; automated vacuum operated chlorine gas equipment and booster pump; telemetry; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Alternates: Addition of a permanent standby propane generator and appurtenances.