Village of Milan Sewer Collection System Improvements

SCOPE 1-Sewer Collection System Improvements: The project includes the replacement of approximately 4,789 linear feet of existing sewer using pipe bursting methods, 780 linear feet of sewer replacement using open trench methods, and approximately 5,878linear feet of sewer replacement using Cured-in-Place Pipe (CIPP) lining which is cured with Ultraviolet (UV) light, as indicated in the plan set Furthermore, the project entails the rehabilitation of four existing manholes through minor repairs, such as regrouting. 19 Manholes will be rehabilitated with constructed solutions including work such as replacement existing manhole frame and cover assemblies, and/or placement of new concrete collars around manhole lids after being brought to existing grade. The project also involves the complete removal and replacement of 89 manholes through new installation. In addition, the project includes the installation of a new Supervisory Control and Data Acquisition (SCADA) system to monitor the sewer collection system for four lift stations Golf Course, Cactus, Berry Hills, and Stanley, as well as for the Public Works office. SCOPE 2-Golf Course Lift Station: Installation of new sewage lift station wet well with an appurtenant valve vault, approximately 300 linear feet of new 4-inch sewer force main, and approximately 60 linear feet of 8-inch gravity sewer main. The existing 4” sanitary sewer line and 4” sewer force main are to be cut and capped once flow is conveyed through the new facilities. The constructed lift station shall be equipped with new dual submersible pumps with new controls, piping, check valves, and level controls. SCOPE 3- Cactus Lift Station Rehabilitation: The project work includes the rehabilitation of the Cactus lift station. Rehabilitation will include the replacement of the two existing Submersible pumps with new submersible pumps and new controls, new guide rails will be installed inside the wet well including associated cabling and level controls. The project also includes electrical components, such as installing new controls and extending 3-phase power to the lift station site. SCOPE 4-Berryhill Lift Station and Sewer System Installation: The project includes the construction of a new sewer collection system for the Berryhill area, involving the installation of approximately 3,027 linear feet of 8-inch gravity sewer main through open trenching as indicated in the plan set. The work also includes installing sewer service connections to the new sewer main for about 37 sewer service line stub-outs, located within the village’s right of way. Work throughout the project site will require the removal and replacement of 2,611 linear feet of 3-inch asphalt pavement. The project also includes the installation of 19 new manholes. The new sewer collection system will be tie-in to the new sewage lift station facility. The project also includes electrical components, such as installing new controls and extending 3-phase power to the new lift station site. The lift station includes two submersible pumps installed in the wet well with guide rails and level controls. Additional scope as outlined in the Contract Documents and Specifications.
Date Company Contact
1731487714
11/13/24 8:48 am
AUI Inc. PO Box 9825
Albuquerque, NM 87119-9825
Julie Rodrigo
Estimating Administrative Manager
Tel: 5052424848
Fax: 5052429050
1733399811
12/5/24 11:56 am
Blackridge Research & consulting 4041 w Hollow Creek Drive
Peoria, IL 61615
Venkatesh Siva
Tel: 9179937467
1733409972
12/5/24 2:46 pm
Cardinal Coatings LLC. 265 East 3900 South
South Salt Lake, UT 84107
Nick Boyer
Estimator
Tel: 8473731481
1731577126
11/14/24 9:38 am
ConstructConnect 3825 Edwards Rd
suite 800
Cincinnati, OH 45209
Sarah Stadalsky
Tel: 8003642059
1731934875
11/18/24 1:01 pm
Construction Reporter 4901 McLeod
Suite 200 A
Albuquerque, NM 87109
Rebecca Taylor
Reporter
Tel: 5052439793
1731424089
11/12/24 3:08 pm
Deltek 2291 Wood Oak Dr
Herndon, VA 20171
Source Management
Tel: 8004562009
1731943136
11/18/24 3:18 pm
File Construction 109 Industrial Ave. NE
Albuquerque, NM 87107
Thomas Wisneski
Tel: 5059771408
Fax: 505.554.1784
1731657920
11/15/24 8:05 am
HA Precast Inc. 12301 Rojas Dr. Suite B26
El Paso,, TX 79928
Bruno Tyree
Sales Mgr.
Tel: 9158014374
1732006494
11/19/24 8:54 am
HO CONSTRUCTION INC 112 LLANO DE SUR SE
ALBUQUERQUE, NM 87102
ROBERT PADILLA
ESTIMATOR
Tel: 505-238-4455
Fax: NONE
1732199331
11/21/24 2:28 pm
Insituform Technologies, LLC 580 Goddard Avenue
Chesterfield, MO 63005
Leanne Goodhue
Business Development Manager
Tel: 720-355-4135
1733990925
12/12/24 8:08 am
Iron Horse LLC PO Box 1472
Fairview Oregon, OR 97024
Brandon Fulton
General Manager
Tel: 5033144032
1732001299
11/19/24 7:28 am
NM Underground Utilities, Inc. 6201 Industry Way SE
Albuquerque, NM 87105
Casey Thompson
Tel: 5058772300
1731492952
11/13/24 10:15 am
Pillar Innovations 5736 US 64
Farmington, NM 87401
Anthony Yellow
Electrical Manager
Tel: 5053267600
1732525519
11/25/24 9:05 am
Pillar Innovations 5736 US 64
Farmington, NM 87401
Michael Patscheck
Tel: 5053267600
1732093827
11/20/24 9:10 am
Riley Industrial Services, Inc. 2615 San Juan Blvd
Farmington, NM 87401
Nathaniel Engels
Project Estimator
Tel: 5053274947
Fax: 5053260305
1732032978
11/19/24 4:16 pm
Sychar LLC 70 Road 4980
Bloomfield, NM 87413
Mike Thibault
General Manager
Tel: 5054394033
Fax: 5056322666
1732000886
11/19/24 7:21 am
TLC Company 5000 Edith Blvd. NE
Albuquerque, NM 87107
Jon Watkins
Tel: 505-944-9509
1732256759
11/22/24 6:25 am
The Barry Group, LLC Indepentent Representative of Tnemec Company, Inc. 5454 Surrey Path, Suite 204
Frisco, TX 75034
Lane Salvato
Manufacturer's Representative
Tel: 9723128448
Fax: 9723128408
1731403489
11/12/24 9:24 am
The Planit Room 1155 Westmoreland, Suite 109
El Paso, TX 79925
Cecilia Hernandez
Tel: 9157812900