Zia Pueblo Chamisa Lagoon Expansion

WW Lagoons Expansion and lift station with forcemain construction

Status

Accepting Bids

Prebid Date 12/3/24 10:00am
Bid Date 12/19/24 2:00pm

Company & Contacts

Wilson & Company
Lidia Cepeda  
5053484130

Location

ZIA PUEBLO, NM

Project involves construction of the new wastewater lagoons adjacent to existing lagoons, new lift station, and forcemains.  Construction of two (2) forcemains of 4” and 6”, involve traversing across the Jemez River and an arroyo via HDD, constituting a total of 1.2 miles of forcemain.  Construction of new lift station and site electrical require site work due to the proximity to a floodplain.  Construction of two (2) lagoons of a combined area of approximately 12 acres, tie-in to work with the existing lagoon system, and includes new drainage improvements.   Project includes Additive Alternates for removal and disposal of sludge from existing lagoons, either through land application or hauled to a landfill.