Portis, KS - Water System Improvements Phase 2

Construction of approximately 2,360 linear feet of 6-inch waterline; 734 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Addendum No. 1 (click to expand/collapse)
Addendum No. 1
This is available for download to registered users. Log in now
Name Size
Addendum No. 1 388.3 KB
Addendum No. 2 (click to expand/collapse)
Addendum No. 2
This is available for download to registered users. Log in now
Name Size
Addendum No. 2 295.2 KB